Change the order of Windows PATH variable entries

Environment Variables Editor 1.5 Beta 5 helps you to simplify the task of changing order of PATH variable entries. Just open the Path editor tab, select the desired entry or even bunch of them and take them to a better place with “↑ Move up” or “↓ Move down” buttons.

In case you are a keyboard lover (as I am), you are more than welcome to use Alt + and Alt + .

Windows Path Editor in action

Download the beta

P.S.
Again, it is in beta stage, don’t forget to backup your PATH variable before playing with the editor.

No comments yet.

Leave a Reply